1 00:00:06,389 --> 00:00:04,230 u.s spacewalk number 79 will begin at 2 00:00:08,390 --> 00:00:06,399 the quest airlock u.s astronaut kayla 3 00:00:10,470 --> 00:00:08,400 barron navy one denoted by the red 4 00:00:13,110 --> 00:00:10,480 stripes will egress first and receive a 5 00:00:15,110 --> 00:00:13,120 very large arosa mod kit strut bag u.s 6 00:00:16,630 --> 00:00:15,120 astronaut raja achary and the plain 7 00:00:19,029 --> 00:00:16,640 white suit will egress second with a 8 00:00:22,230 --> 00:00:19,039 crew luck bag after quick buddy checks 9 00:00:25,189 --> 00:00:22,240 ev1 will head up to phase one and out to 10 00:00:27,910 --> 00:00:25,199 the s4 integrated equipment assembly 11 00:00:30,390 --> 00:00:27,920 pausing momentarily to drop her fairlead 12 00:00:32,709 --> 00:00:30,400 green hook just inboard of the solar 13 00:00:35,910 --> 00:00:32,719 alpha rotary joint and then continue her 14 00:00:37,910 --> 00:00:35,920 translation out to the s4 3 alpha 15 00:00:40,709 --> 00:00:37,920 integrated equipment assembly where she 16 00:00:42,790 --> 00:00:40,719 will stow the large arosa mod kit strut 17 00:00:45,190 --> 00:00:42,800 bag and prep for the building of the 18 00:00:48,950 --> 00:00:45,200 upper triangle of the mod kit meanwhile 19 00:00:50,709 --> 00:00:48,960 ev2 will follow ev1 up to phase 1. ev2 20 00:00:52,389 --> 00:00:50,719 will stop at the starboard cedar cart 21 00:00:54,549 --> 00:00:52,399 where he will temp stow a crew lock bag 22 00:00:56,470 --> 00:00:54,559 of tools and retrieve a foot restraint 23 00:00:58,709 --> 00:00:56,480 and a worksite interface extender known 24 00:01:01,270 --> 00:00:58,719 as a wiff x and then translate out board 25 00:01:03,270 --> 00:01:01,280 pausing momentarily to drop his fairly 26 00:01:05,910 --> 00:01:03,280 green hook just in board of the solar 27 00:01:08,950 --> 00:01:05,920 alpha rotary joint continuing outboard 28 00:01:11,350 --> 00:01:08,960 ev2 will cross over to the radiator side 29 00:01:14,070 --> 00:01:11,360 of the iea and stow the foot restraint 30 00:01:17,190 --> 00:01:14,080 and the worksite interface extender into 31 00:01:18,950 --> 00:01:17,200 the worksite interface number 26. ev2 32 00:01:21,590 --> 00:01:18,960 will then set up the foot restraint for 33 00:01:23,030 --> 00:01:21,600 optimum arosa mod kit upper triangle 34 00:01:25,670 --> 00:01:23,040 installation 35 00:01:28,310 --> 00:01:25,680 and then translate over to join ev1 to 36 00:01:30,950 --> 00:01:28,320 begin assembling the upper triangle 37 00:01:32,870 --> 00:01:30,960 ev1 and ev2 will work together to build 38 00:01:35,030 --> 00:01:32,880 the upper triangle the crew will build 39 00:01:36,870 --> 00:01:35,040 the triangular segment loosely and that 40 00:01:38,550 --> 00:01:36,880 will tighten up the structure by driving 41 00:01:40,950 --> 00:01:38,560 the bolts to torque 42 00:01:42,950 --> 00:01:40,960 ev2 will then translate over to and 43 00:01:44,789 --> 00:01:42,960 ingress the foot restraint ev1 will 44 00:01:47,190 --> 00:01:44,799 reposition for the handoff maybe one 45 00:01:50,389 --> 00:01:47,200 will hand off the upper triangle to ev2 46 00:01:52,310 --> 00:01:50,399 ev2 will lay back and work to soft dock 47 00:01:55,350 --> 00:01:52,320 the segment onto the beta gimbal 48 00:01:57,670 --> 00:01:55,360 assembly and then drive four bolts ev1 49 00:02:00,870 --> 00:01:57,680 will temp stow her pgt with a short 50 00:02:03,030 --> 00:02:00,880 socket on a local handrail while ev2 51 00:02:05,749 --> 00:02:03,040 will egress the foot restraint and bias 52 00:02:08,550 --> 00:02:05,759 it to the left hand side ev1 will go 53 00:02:11,270 --> 00:02:08,560 over to the back and retrieve the left 54 00:02:15,510 --> 00:02:11,280 mid strut and work to pass this off to 55 00:02:18,150 --> 00:02:15,520 ev2 for a body restraint tetherstone ev2 56 00:02:20,790 --> 00:02:18,160 will then re-ingress the foot restraint 57 00:02:23,510 --> 00:02:20,800 while ev1 retrieves the long eight foot 58 00:02:26,949 --> 00:02:23,520 lower strut from the bag and hands it to 59 00:02:29,589 --> 00:02:26,959 ev2 while av2 holds the long lower strut 60 00:02:31,670 --> 00:02:29,599 ev1 will reposition to the solar array 61 00:02:34,150 --> 00:02:31,680 blanket box or saab 62 00:02:36,070 --> 00:02:34,160 for the install of the left lower strut 63 00:02:38,550 --> 00:02:36,080 as a team the crew will move the strut 64 00:02:41,990 --> 00:02:38,560 into position and ev1 will begin at 65 00:02:44,150 --> 00:02:42,000 driving this bolt by hand four turns ev2 66 00:02:46,309 --> 00:02:44,160 will then work to align and drive his 67 00:02:50,150 --> 00:02:46,319 bolt on the mounting bracket side two 68 00:02:52,070 --> 00:02:50,160 turns and then ev1 will work to complete 69 00:02:54,229 --> 00:02:52,080 the torque on this bolt by driving with 70 00:02:56,309 --> 00:02:54,239 the pistol grip tool to a high torque 71 00:02:57,910 --> 00:02:56,319 and then following with an even higher 72 00:03:00,630 --> 00:02:57,920 torque on the torque wrench once the 73 00:03:03,030 --> 00:03:00,640 bolt is deemed good ev2 will be given a 74 00:03:05,110 --> 00:03:03,040 go to drive his bolts to torque using 75 00:03:07,589 --> 00:03:05,120 the pistol grip tool and this completes 76 00:03:09,990 --> 00:03:07,599 our minimum config ev1 will reposition 77 00:03:11,830 --> 00:03:10,000 to the beta gimbal assembly and ev2 will 78 00:03:14,309 --> 00:03:11,840 hand off the telescoping mid strut for 79 00:03:17,190 --> 00:03:14,319 install ev1 will work to soft dock the 80 00:03:19,670 --> 00:03:17,200 side pad onto the bta while ev2 holds 81 00:03:22,070 --> 00:03:19,680 his clevis both side in place ev1 will 82 00:03:24,949 --> 00:03:22,080 start her four bolt two turns with the 83 00:03:26,550 --> 00:03:24,959 pistol grip tool and then ev2 will drive 84 00:03:29,030 --> 00:03:26,560 his clevis bolt to torque on the 85 00:03:32,070 --> 00:03:29,040 mounting bracket ev-1 will then complete 86 00:03:34,630 --> 00:03:32,080 her four bolts with her pistol grip tool 87 00:03:36,869 --> 00:03:34,640 and then ev2 will drive his bolt to 88 00:03:39,589 --> 00:03:36,879 torque 89 00:03:41,830 --> 00:03:39,599 ev2 will then egress and reposition the 90 00:03:43,190 --> 00:03:41,840 foot restraint to bias it to the right 91 00:03:44,949 --> 00:03:43,200 hand side 92 00:03:47,270 --> 00:03:44,959 the mod the crew will then repeat the 93 00:03:49,910 --> 00:03:47,280 handoff sequence first then mid strut 94 00:03:52,309 --> 00:03:49,920 for body restraint tether stow foot 95 00:03:55,190 --> 00:03:52,319 restraint ingress followed by hand off 96 00:03:57,110 --> 00:03:55,200 of the very long lower right strut ev1 97 00:03:59,030 --> 00:03:57,120 will then reposition to the right hand 98 00:04:01,670 --> 00:03:59,040 side of the three alpha beta gimbal 99 00:04:04,470 --> 00:04:01,680 assembly and an analogous install on 100 00:04:07,030 --> 00:04:04,480 strategy will unfold ev1 will position 101 00:04:09,830 --> 00:04:07,040 at the right saab bearing for lower 102 00:04:12,949 --> 00:04:09,840 strut install and drive the lower strut 103 00:04:14,949 --> 00:04:12,959 to torque ev1 will drive his clevis 104 00:04:17,509 --> 00:04:14,959 bolts to the mounting bracket 105 00:04:18,710 --> 00:04:17,519 ev-1 will then reposition at the bga and 106 00:04:20,629 --> 00:04:18,720 they will hand off the wright's 107 00:04:22,550 --> 00:04:20,639 telescoping mid-struts following the 108 00:04:24,550 --> 00:04:22,560 same install strategy 109 00:04:26,710 --> 00:04:24,560 once complete tv-1 will translate onto 110 00:04:28,710 --> 00:04:26,720 the mid-strut and drive two collar bolts 111 00:04:30,469 --> 00:04:28,720 to torque to lock out the telescoping 112 00:04:32,390 --> 00:04:30,479 mechanism and rigidize the right hand 113 00:04:35,670 --> 00:04:32,400 side ev2 will then egress the foot 114 00:04:38,070 --> 00:04:35,680 restraint and begin to clean up 115 00:04:40,790 --> 00:04:38,080 once the multi-layer installation or mli 116 00:04:42,550 --> 00:04:40,800 is fully closed and wired tied down ev1 117 00:04:45,990 --> 00:04:42,560 will reposition to repeat the collar 118 00:04:48,230 --> 00:04:46,000 bolt and mli ops on the left hand side 119 00:04:50,390 --> 00:04:48,240 pv2 will then translate around the 120 00:04:52,390 --> 00:04:50,400 integrated equipment assembly install 121 00:04:54,150 --> 00:04:52,400 the jewels back in the bag you'll then 122 00:04:56,629 --> 00:04:54,160 fold it in to third for ready for 123 00:04:59,030 --> 00:04:56,639 translation and later in the eba ev2 124 00:05:00,870 --> 00:04:59,040 will then translate back around the iea 125 00:05:02,390 --> 00:05:00,880 to the foot restraint and work to stow 126 00:05:04,629 --> 00:05:02,400 the foot restraint in the worksite 127 00:05:07,270 --> 00:05:04,639 interface extender on his body restraint 128 00:05:10,070 --> 00:05:07,280 tether ev1 the meanwhile will translate 129 00:05:11,909 --> 00:05:10,080 over to the non-radiator side of the iea 130 00:05:13,990 --> 00:05:11,919 to take some still imagery of the 131 00:05:16,550 --> 00:05:14,000 completed mod kit ev1 will then 132 00:05:18,870 --> 00:05:16,560 translate out to s6 to our battery 133 00:05:21,350 --> 00:05:18,880 charge discharge unit she will begin 134 00:05:24,310 --> 00:05:21,360 installing some wire ties on a handrail 135 00:05:26,469 --> 00:05:24,320 and prep for restraining the mli or 136 00:05:28,870 --> 00:05:26,479 multi-layer insulation that covers the 137 00:05:30,870 --> 00:05:28,880 battery charge discharge unit meanwhile 138 00:05:33,029 --> 00:05:30,880 ev2 will translate out to the starboard 139 00:05:35,350 --> 00:05:33,039 cedar cart to stow the foot restraint 140 00:05:37,670 --> 00:05:35,360 and worksite interface extender low 141 00:05:39,590 --> 00:05:37,680 profile on the starboard zeta cart ev2 142 00:05:41,909 --> 00:05:39,600 will then retrieve the crew lock bag 143 00:05:45,830 --> 00:05:41,919 onto his body restraint tether and head 144 00:05:47,830 --> 00:05:45,840 back out to s6 to join ev1 both crew 145 00:05:49,909 --> 00:05:47,840 will work together to open the 146 00:05:52,550 --> 00:05:49,919 multi-layer insulation covering the 147 00:05:55,270 --> 00:05:52,560 battery charge discharge units this will 148 00:05:57,430 --> 00:05:55,280 allow for robotic access when needed in 149 00:05:59,830 --> 00:05:57,440 the future they'll perform some on-orbit 150 00:06:02,469 --> 00:05:59,840 origami record it to the shape of a 151 00:06:04,629 --> 00:06:02,479 triangle and restrain it out with a wire 152 00:06:07,909 --> 00:06:04,639 tie to a local handrail the crew will 153 00:06:10,150 --> 00:06:07,919 then work to break torque first on h1 154 00:06:13,029 --> 00:06:10,160 followed by h2 and then restrain the 155 00:06:15,830 --> 00:06:13,039 other mli back to open and expose the 156 00:06:17,909 --> 00:06:15,840 second battery charge discharge unit 157 00:06:20,710 --> 00:06:17,919 and then work to break torque 158 00:06:23,990 --> 00:06:20,720 and reinstall to a known lower torque on 159 00:06:25,909 --> 00:06:24,000 the second battery charge discharge unit 160 00:06:29,029 --> 00:06:25,919 both crew then we'll clean up and 161 00:06:31,749 --> 00:06:29,039 retrieve the crew lock bag to the 162 00:06:33,510 --> 00:06:31,759 brt or body restraint tether and begin 163 00:06:36,390 --> 00:06:33,520 to head inboard 164 00:06:37,749 --> 00:06:36,400 the completion of the eba eb2 will lead 165 00:06:40,150 --> 00:06:37,759 the way in 166 00:06:43,110 --> 00:06:40,160 since he led with second outboard 167 00:06:46,070 --> 00:06:43,120 translate across the iea retrieve his 168 00:06:47,590 --> 00:06:46,080 fairlead green hook translate under the 169 00:06:49,189 --> 00:06:47,600 mt 170 00:06:53,350 --> 00:06:49,199 and at the c to handrail bridge 171 00:06:55,749 --> 00:06:53,360 translate nader down to our airlock ev1 172 00:06:57,510 --> 00:06:55,759 in the meanwhile will translate to the 173 00:06:59,350 --> 00:06:57,520 s4 iea 174 00:07:03,270 --> 00:06:59,360 retrieve the folded up 175 00:07:05,270 --> 00:07:03,280 mod kit bag grab her fairlead green hook 176 00:07:07,029 --> 00:07:05,280 translate past the cedar carts hitting 177 00:07:09,670 --> 00:07:07,039 those brake pedals 178 00:07:13,350 --> 00:07:09,680 down the sida handrail bridge and to the